Service Information
Description Of Service
A service provided to the business sector to Temporary Fence Permit (Shinko) Request for Site Under construction for construction purpose
Customer Types
Service Required Documents
Required Documents
Businesses
A copy of affection plan approved by the Planning and Survey Department (valid), Building permission , Signs identification form , billboard, Contractor license (Valid), Consultant license (Valid), Sharjah Roads & Transport Authority NOC (for asphalt roads)
Terms Of Service
Service application must be submitted by the consultant or contractor.
The building permit must be valid, with no violations on the contractor and consultant.
No violations registered on the plot.
The contractor’s and consultant’s Licenses must be valid.
The building permit is valid one year for residential construction, and six months for other types of construction).
Distance between the fence and the land boundaries must not exceed 3.00 meters in the direction of the sandy roads and adjacent vacant lands.
The Temporary fence in commercial and industrial areas and in main streets of residential areas must be made of aluminium.
The height of the temporary fence must not be less than (180) cm.
The height of the temporary fence from the ground must not exceed (5) cm.
The distances between the panels of the temporary fence shall not exceed (2.5) cm.
Writing and drawing on the temporary fence can only be done after obtaining a permit from the Government Communication Department.
Thickness of the temporary fence must not be less than 6 mm.
Support Documents
Delivery
Time For Completing Service
working days
Service Output
Engineering permit for temporary fencing
Channels
Service Center Name
Control & Inspection Dept
Available Service Centre
website
Service Contact No
065162204
Fees
Service Fees
fees
Description Of Fees
Temporary fence fee for a site under construction 500
Fees for connecting services to a site under construction 200
scientific research fees 10
tahseel fees 10.5
Notes